Arkansas Pallet Rack Requirements
What it takes to permit, engineer, and install steel storage racks in Arkansas. Every claim cited to a primary source.
At a glance
Required for racks > 5'-9" in cities that adopt IBC; many rural counties have no enforcement.
ANSI MH16.1 required statewide; SDC D in eastern AR (New Madrid).
IFC Ch. 32 โ AR State Fire Marshal reviews high-piled storage > 12 ft (> 6 ft high-hazard) statewide.
AR-licensed PE required (AR Code Title 17, Ch. 30).
Free quotes
Skip the research โ get a Arkansas permitting expert on it
Free quotes from partners in Arkansas who handle permits, sealed drawings, and fire-marshal coordination.
Last reviewed: 2026-06-18
๐ Building Permit
- Adopted code
- Arkansas has NO statewide commercial building code โ the State Fire Marshal's office adopts the Arkansas Fire Prevention Code (Vol. II = "Building Code", based on IBC 2021 with state amendments), and local cities adopt the IBC by ordinance for non-fire building review. Little Rock, Fayetteville, and Bentonville each adopt the 2021 IBC.
- Permit threshold
- Per IBC ยง105.2 as adopted by local cities โ racks installed as part of a building are permit-triggering; rack-only work is reviewed under IFC Ch. 32 by the Fire Marshal when storage exceeds 12 ft (6 ft high-hazard).
- Issuing authority
- Local building department in IBC-adopting cities (Little Rock Building Codes Div., Fayetteville Building Safety Div., Bentonville Building Inspection Dept.). Arkansas State Fire Marshal handles fire-code review statewide and is effectively the only AHJ in many rural counties.
- Typical fee range
- Bentonville: $580 for first $100K of valuation + $3/$1K up to $500K; $2,120 + $2/$1K above $500K (ICC Building Valuation Data Table). Little Rock: roughly 0.5โ1.5% of valuation + plan review (~65% of permit fee) + $25 data processing. Fayetteville: valuation-based per IBC table.
- Typical review time
- Unable to verify published commercial timelines for Little Rock, Fayetteville, or Bentonville from public sources โ typical practice is 2โ4 weeks for first review on a straightforward rack/high-pile package.
๐ Seismic Requirements
- Seismic Design Category
- Eastern AR (Mississippi, Crittenden, Phillips counties around West Memphis) reaches D. Central AR (Little Rock/Pulaski) generally B. NW AR (Bentonville/Fayetteville) AโB
- Sds range
- Site-specific. Typical Site Class D values: West Memphis / Crittenden Co. ~1.0โ1.4g (SDC D, New Madrid); Little Rock ~0.20โ0.35g (SDC B); Bentonville / Fayetteville ~0.12โ0.20g (SDC AโB). Confirm with site-specific USGS Design Maps.
- Anchoring & bracing
- ANSI MH16.1-2021 (RMI) โ Direct Analysis Method replaced ELM; references ASCE 7 seismic loads. Heavy detailing and anchoring required in eastern AR's SDC D zone, including base-plate anchorage to slab, cross-aisle ties, and Ip considerations for higher Risk Category facilities.
๐ฅ Fire Marshal
- When fire review is triggered
- IFC Ch. 32 (as adopted in Arkansas Fire Prevention Code 2021) โ high-piled storage > 12 ft (> 6 ft for Class IV / high-hazard) requires plans showing rack layout, commodity class, aisle widths, flue spaces, sprinkler / in-rack protection. Arkansas State Fire Marshal reviews statewide.
๐๏ธ Engineer Stamp
- When PE-stamped drawings are required
- Yes for engineering plans submitted for permit. Arkansas Code Title 17, Ch. 30 requires AR-licensed PE seal; comity (PE-C) available for out-of-state PEs.
โ ๏ธ Local Quirks
Things that surprise out-of-state buyers in Arkansas.
- NW Arkansas logistics corridor (Walmart HQ Bentonville, Tyson Springdale, JB Hunt Lowell) โ Bentonville, Rogers, Springdale, and Fayetteville run real IBC commercial review, but rack permitting is often bundled with shell building.
- Eastern AR / New Madrid Seismic Zone (Mississippi, Crittenden, Phillips counties + West Memphis) โ SDC D triggers full MH16.1 seismic detailing.
- Rural counties: many unincorporated areas have no local building department โ Fire Marshal is the only AHJ. Standalone rack-only installs in rural counties may have no permit trigger except the IFC Ch. 32 fire side.
- State Fire Marshal handles all statewide fire review regardless of city. Plan for a parallel fire review on any high-piled project.
- Cold-storage / food processing facilities (Tyson, Cargill, Simmons) often involve freezer-rated sprinkler design and ammonia overlays in addition to rack permits.
Sources
Every claim on this page links to a primary source.
- Arkansas Dept of Labor and Licensing โ Building Codes
- ICC โ Arkansas Adoptions
- Arkansas Fire Code 2021 โ Chapter 32
- Fayetteville Commercial Projects
- Bentonville Building Permit Fees
- Little Rock Ord. 22204 (Fees, PDF)
- Arkansas State Fire Marshal
- AR Board of Licensure for PE & PS
- AR Board Rules & Laws Handbook 2025 (PDF)
- AR Code ยง17-30-301 et seq.
- USGS New Madrid Seismic Zone
Informational only โ verify with your local AHJ.
Code requirements vary by jurisdiction and change on three-year cycles. Local amendments, fire-marshal interpretation, and your specific project conditions can shift what's actually required. This page is a starting point, not engineering or legal advice. Always confirm with your Authority Having Jurisdiction before designing or installing.