At a glance
Required for racks > 5'-9" in adopting jurisdictions; rural counties often no enforcement.
ND is essentially all SDC A โ minimum lateral force only per MH16.1 + ASCE 7 ยง1.4.3.
IFC Ch. 32 โ > 12 ft storage AND > 500 sq ft high-piled area; ND State Fire Marshal enforces.
ND-licensed PE required (NDCC 43-19.1); comity available.
Free quotes
Skip the research โ get a North Dakota permitting expert on it
Free quotes from partners in North Dakota who handle permits, sealed drawings, and fire-marshal coordination.
Last reviewed: 2026-06-18
๐ Building Permit
- Adopted code
- North Dakota State Building Code based on the 2021 I-Codes (IBC/IFC/IMC/IFGC) with state amendments. Statewide adoption is mandatory for state-owned/leased buildings, but for private projects the DCS does not enforce โ local cities/counties choose to adopt and enforce. The 2024 I-Codes update is scheduled for adoption effective January 1, 2026 (building) and July 1, 2026 (fire).
- Permit threshold
- Storage racks over 5 ft 9 in (1,753 mm) in height require a permit per IBC ยง105.2 work-exempt list; racks below that height are exempt. ND has not amended this provision.
- Issuing authority
- The local building official in jurisdictions that have adopted the code (Fargo, Bismarck, Grand Forks, West Fargo, Minot, Dickinson, Williston). Many rural counties have no building department โ rack work proceeds without a building permit in those areas, but the State Fire Marshal still has fire-code jurisdiction.
- Typical fee range
- Fargo uses a valuation-based fee schedule with plan review at 20% of the building permit fee, $50 minimum. For a typical $25Kโ$75K rack install, expect roughly $400โ$1,200 total (permit + plan review). Bismarck publishes its own valuation table; comparable range.
- Typical review time
- Not formally published by Fargo or Bismarck. Verbal benchmarks from those offices typically run 2โ4 weeks for commercial plan review.
๐ Seismic Requirements
- Seismic Design Category
- A across essentially all of North Dakota under ASCE 7-22 / IBC 2021. The state has the lowest seismicity in the continental US
- Sds range
- Typical Sds values across ND run roughly 0.02gโ0.06g (Site Class D default). Far below the SDC B threshold of 0.167g.
- Anchoring & bracing
- ANSI/RMI MH16.1-2021 governs steel storage rack design. In SDC A, seismic detailing requirements are minimal; ASCE 7-22 ยง11.7 only requires lateral force per ยง1.4.3 (5% of operating weight). MH16.1 still requires the rated capacity placard and configuration drawings.
๐ฅ Fire Marshal
- When fire review is triggered
- The ND State Fire Marshal (under the Insurance Department) administers the fire code statewide via NDAC 45-18-01. IFC Chapter 32 (High-Piled Combustible Storage) triggers fire-marshal review when storage exceeds 12 ft (or 6 ft for high-hazard commodities) and the high-piled area exceeds 500 sq ft.
๐๏ธ Engineer Stamp
- When PE-stamped drawings are required
- Yes for engineered drawings. NDCC Ch. 43-19.1 and NDAC 28-02.1-08 require any final engineering drawings, specifications, maps, plats, reports, or other documents prepared by a person required to be registered to be signed, dated, and sealed by a ND-licensed PE. Out-of-state PEs must obtain ND comity licensure.
โ ๏ธ Local Quirks
Things that surprise out-of-state buyers in North Dakota.
- Bakken oil/gas region (Williston, Watford City, Dickinson) drives heavy industrial rack demand โ pipe storage, parts/MRO warehouses, frac sand.
- Cold-weather steel: ASTM A1085/A500 with consideration for low-temp brittle fracture in unheated facilities.
- Agriculture warehouses (Red River Valley) often fall outside enforced jurisdictions.
- Population sparsity means many rural counties have no plan reviewer โ fire marshal becomes the de facto AHJ via IFC Ch. 32.
- Lowest seismic risk in the lower 48 โ but anchorage still required per MH16.1 minimums.
Sources
Every claim on this page links to a primary source.
Informational only โ verify with your local AHJ.
Code requirements vary by jurisdiction and change on three-year cycles. Local amendments, fire-marshal interpretation, and your specific project conditions can shift what's actually required. This page is a starting point, not engineering or legal advice. Always confirm with your Authority Having Jurisdiction before designing or installing.