Carton Flow Rack Suppliers in Michigan — 2 Companies
Carton flow is pallet flow's smaller sibling — gravity-fed roller or wheel tracks built into rack shelves so cases and cartons roll forward as you pick from the front. It turns a static pick face into a self-replenishing one, cutting walk time and keeping the most-picked items within arm's reach. Michigan's warehouse sector is deeply tied to the auto industry — parts storage, assembly line feeding, and finished vehicle logistics. Detroit, Grand Rapids, and the I-94 corridor between them form the core industrial market. The state is also a major cross-border trade point with Ontario, Canada.
Learn more about carton flow rack in Michigan ↓Carton Flow Rack Suppliers in Michigan (2)
DEMO MFR 1 - revised
We are just a demo company trying this out.
UNIRAK
UNIRAK manufactures quality pallet rack and storage products made in the USA at their Taylor Michigan facility. They offer selective drive-in push-back carton flow and mezzanine systems with quick-ship options.
Nearby Carton Flow Rack Suppliers
These companies serve areas near Michigan.
A-Lined Handling Systems
A-Lined Handling Systems is a turnkey material handling integrator and authorized Steel King distributor serving Connecticut and the Northeast.
Advance Storage Products
Advance Storage Products is a leading manufacturer of push-back pallet rack and other high-density storage systems. They operate manufacturing facilities in California Georgia and Utah.
AR Racking Inc.
International manufacturer of industrial racking and storage systems with US operations in Charlotte, NC. Part of the Arania Group. Designs, manufactures, and installs a full range of storage solutions with a 5-year quality warranty.
AJ Enterprises
AJ Enterprises installs every size and style of pallet racking in Wisconsin Illinois and across the United States including warehouse shelving and storage systems.
Andersen & Associates, Inc.
Authorized Ridg-U-Rak dealer based in Twinsburg, OH.
Associated Integrated Supply Chain Solutions
Authorized Ridg-U-Rak dealer based in Indianapolis, IN.
When to Choose Carton Flow Rack
- ✓Each-pick or case-pick operations with high SKU counts
- ✓Order pickers spend too much time walking between picks
- ✓You need a self-replenishing pick face that stays organized
- ✓FIFO rotation at the carton level is required
- ✓You're designing a pick module or mezzanine pick area
Key Specs to Ask About
- •Track type (wheel rails, full-width rollers, or tilted shelf inserts)
- •Lane width (sized to your carton/case dimensions)
- •Number of lanes per shelf level
- •Shelf depth (typically 3-6 cartons deep per lane)
- •Knuckled tracks or flat — knuckled helps with heavier cartons
- •Integration with pick-to-light or voice-pick systems
How It Compares
| Factor | Carton Flow | Static Shelving |
|---|---|---|
| Replenishment | Self-replenishing — gravity feeds product forward | Manual — must restock shelf positions |
| Pick speed | 250-400+ picks/hour achievable | 80-120 picks/hour typical |
| Best for | High-volume each-pick and case-pick | Low-velocity items, parts rooms |
| Cost | $$$ (flow tracks add to rack cost) | $ (basic steel shelving) |
| Space efficiency | Moderate — lanes are sized to carton dimensions | High flexibility — any item on any shelf |
Carton flow makes sense when pick speed is the priority — the gravity-fed lanes keep product at the pick face without manual restocking. Static shelving works for lower-velocity items where the simpler system is adequate. Most pick operations use both — carton flow for fast movers, shelving for slow movers.
Michigan has more than 11,000 inland lakes but no ocean coastline. It does, however, share the busiest trade crossing in North America with Canada. The trucks crossing that border every day carry enough auto parts to build approximately 15,000 cars.
Frequently Asked Questions
What's the difference between carton flow and pallet flow?
How much does carton flow rack cost?
Can I retrofit carton flow into my existing rack?
How many carton flow rack suppliers are in Michigan?
Before carton flow existed, order pickers in the 1960s walked an average of 12 miles per shift. That's nearly a half marathon, five days a week, in steel-toed boots.
Coverage Map
Related Services
Need help with your project?
Tell us what you’re looking for and we’ll route your request to qualified companies. Free, no commitment.
Get QuotesAre you a racking company?
Get listed in the directory and start receiving qualified leads.
List Your Company